The line that marks the dividing point between internal and offshore waters for several U.S. statutes. It generally follows the seaward high-water shoreline, with exceptions listed in 46 CFR Part 7.

How it works

The Boundary Line separates the inside from the offshore for a set of U.S. laws, and it is defined in 46 CFR Part 7. In general it follows the trend of the seaward high-water shoreline, with exceptions for particular places, so the local line has to be checked in the regulations. The Coast Guard's load line policy notes put it as the line separating inland waters from the high seas.

It decides which rules apply. The policy notes say vessels operating inside the Boundary Line are not subject to load line requirements, and 46 CFR 10.107 defines a seagoing vessel as one authorized by its Certificate of Inspection to proceed beyond it. It is also the dividing point in the hours-of-rest rule in 46 CFR 15.1111, which applies to watchkeepers on vessels that operate beyond the boundary line.

Do not mix it with the COLREGS demarcation line. The Load Line Policy Notes say expressly that they are not the same: the Boundary Line is about load lines and credentials, and the demarcation line separates the Inland Rules from the International Regulations.

What to know for the exam

  • Regulation questions ask which line separates the waters where load line requirements do not apply from the high seas, and whether a vessel on a domestic voyage outside the Boundary Line needs a load line.
  • Others ask how the 10-hour and 77-hour rest rules in 46 CFR 15.1111 apply to officers on a vessel beyond the boundary line.
  • A question on the demarcation line is the usual companion, so know which line governs which rules.

Common questions

Sources