Skip to content
Mariner IQ
Start Free
Gas Turbines

Gas Turbine Self-Synchronizing Clutch: Labeled Cutaway

Exam reference: GT-0018 (the label exam questions use for this figure)

FIGURE · SELF-SYNCHRONIZING CLUTCH CUTAWAYTAP TO ENLARGE

What the figure shows

A cutaway isometric drawing of a clutch with a cover and bolt flange on top and a cylindrical body below. Arrows label the cover, engaged and disengaged switch mechanism, dashpot, output assembly, relay assembly, lock-out control, input assembly and main sliding assembly.

How to read it

  1. Find the input assembly and the output assembly first; engagement depends on how their speeds compare.
  2. Locate the main sliding assembly and relay assembly, the parts that move as the clutch shifts.

What exam questions ask

  • How the clutch engages. It is fully automatic: it locks up when the input shaft flange tries to turn faster than the output assembly, and the gear-toothed elements then carry power.

Common mistakes

  • Thinking engagement happens once the output starts turning. It engages when the input overtakes the output.
  • Expecting manual engagement or compressor air pressure to shift it. Relative shaft speed alone does the work.

Related figures

All exam figuresPractice on the DDE 1000/4000 HP practice test